The mechanical code edition in force in New Hampshire, with its effective date, the adopting authority and an official link. Factual adoption data only — confirm with your local AHJ.
IMC (ICC) in force in New Hampshire
2024 IMC
Adopting authority
NH State Building Code Review Board / NH Division of Fire Safety (State Fire Marshal's Office)
Authority websiteNH uses the ICC family and adopts the 2024 International Mechanical Code (IMC) as part of the State Building Code under RSA 155-A, effective July 1, 2026, with state amendments. Local amendments permitted.
State adoption is the baseline. Your local building department may amend it or enforce a different edition — always confirm with the authority having jurisdiction (AHJ) before you design, bid or pull a permit.
New Hampshire has adopted 2024 IMC (ICC) with an effective date of July 1, 2026. The body responsible for adoption and enforcement is NH State Building Code Review Board / NH Division of Fire Safety (State Fire Marshal's Office). This is the jurisdiction-wide baseline — your local building department may amend it or enforce a different edition, so confirm with the authority having jurisdiction before you design, bid or pull a permit.
NH uses the ICC family and adopts the 2024 International Mechanical Code (IMC) as part of the State Building Code under RSA 155-A, effective July 1, 2026, with state amendments. Local amendments permitted. The official code text is published by the standards body and is free to read online — use the official link above to read it. We link and cite the code; we do not reproduce it.
FAQ
New Hampshire has adopted 2024 IMC (ICC), effective July 1, 2026. The adopting authority is NH State Building Code Review Board / NH Division of Fire Safety (State Fire Marshal's Office). Verified November 11, 2026.
NH uses the ICC family and adopts the 2024 International Mechanical Code (IMC) as part of the State Building Code under RSA 155-A, effective July 1, 2026, with state amendments. Local amendments permitted.
It is the specific edition of a model code (for example the 2023 NEC or the 2021 IBC) that a state has legally adopted and currently enforces. Codes are republished on roughly three-year cycles, and each jurisdiction adopts a new edition on its own schedule — often with amendments — so the edition in force varies by place and by discipline.
Not always. Many jurisdictions set a baseline edition for the whole state, but local building departments (the authority having jurisdiction, or AHJ) can amend it or enforce a different edition. Some places leave most adoption to local jurisdictions, and a few large cities run their own codes. Always confirm with your AHJ.
The NEC (NFPA 70) for electrical, the ICC I-Codes (IBC/IRC) for building, the UPC (IAPMO) or IPC (ICC) for plumbing, the IMC/UMC for mechanical, the IFGC/NFPA 54 for fuel gas, and the IFC/NFPA 1 for fire.
NFPA offers free read-only online access to many of its standards including the NEC, and the ICC publishes its I-Codes through a free online reading room. Each result links to the official source.
Trade codes are copyrighted by their standards bodies (NFPA, ICC and IAPMO). This directory publishes only factual adoption data — which edition is in force, when it took effect, who the authority is, whether it is amended, and where to read it officially — and links you to the official source for the code text itself.
This record was verified against NH State Building Code Review Board / NH Division of Fire Safety (State Fire Marshal's Office) and the relevant standards body on November 11, 2026. We publish factual adoption data only — never code text.
Last reviewed November 11, 2026.
We're committed to keeping these tools accurate and improving them over time. If you'd like to contribute to their accuracy, or you run into any issues or errors, please email us at info@tradesppl.com.